Parkville precinct development plan : draft for public display
2017
Book
Cross Yarra Partnership has been selected as the preferred contractor by Melbourne Metro Rail Authority to design, build and maintain the stations and tunnels for the Metro Tunnel Project. The project includes two nine-kilometre train tunnels and five new underground train stations, linking the north west Sunbury rail corridor and the south east Cranbourne/Pakenham rail corridor, unlocking additional capacity in the existing City Loop. The five new underground stations are located at Arden, Parkville, CBD North, CBD South and Domain. Parkville Station will be directly below Grattan Street, connecting to a new tram stop on Royal Parade.
Main title:
Parkville precinct development plan : draft for public display / Melbourne Metro Rail Authority, Cross Yarra Partnership, Victoria State Government.
Author:
Melbourne Metro Rail Authority, issuing bodyVictoria, issuing bodyCross Yarra Partnership, consultant
Imprint:
Melbourne, Vic. : Melbourne Metro Rail Authority, 2017.
Collation:
iv, 39, [6], [96] pages : colour illustrations, plans ; 30 x 43 cm
Notes:
Cover title."27/11/2017".Spiral binding.Pages i-iv, 1-45 measured 30 x 22 cm ; Pages [46-96] measured 30 x 43 cm.
Dewey class:
711.75099451711.75
Language:
English
Subject:
BRN:
505763
| Location | Collection | Call number | Status/Desc |
|---|---|---|---|
| North Melbourne Library | Local History Reference | LH REF 711.75 PARK | Not for loan (Set: 19 Mar 2018) |